CM4. Product Engineering, Production Machines and Quality Control
Welcome to CM4
Services
Industrialisation & Automatisation
Design and Product Engineering
Quality Control and Testing
Railway Industry
Who we are?
History
Our Facilities
Our Team
Case studies
Industrialisation & Automatisation
Design and Product Engineering
Quality Control and Testing
Railway Industry
Contact
News
Industrialisation & Automatisation Industrialisation
& Automatisation
Design and Product Engineering Design
and Product
Engineering
Quality Control & Testing Quality Control
and Testing
Railway Industry Railway
Industry

Industrialisation and Automatisation Case Studies

Process industrialisation
Production process automatisation
Quality control and testing
Design and product engineering
Our mission is to find solutions to your engineering challenges.
 

O-rings insertion transfer machine.

This machine has 5 stations. The principal assignment is the placement of O-rings in the widened of a hydraulic pipe for the sector of the automotion, and its later check by artificial vision.

 

  • The machine’s cadence is 20 parts per minute. The first station takes the parts from another machine.
  • The second station is the one that places the O-rings; this station has a vibrator in each side for the supply of the O-rings. It has an approximately autonomy of 4 hours.
  • Third and fourth stations are symmetrical, in them the artificial vision checks the product quality; checking the presence of O-ring, the widened levels, inventory of made pieces OK and NOK...
  • The fifth station separates the pieces in each one of the three exit vats, one for the good pieces, the recoverable ones and the wrong ones that cannot be recovered.

     

Industrialisation and Automatisation Case Studies

Industrialisation and Automatisation Case Studies

3D Image


Contact
Tel: +34 93 660 5023
E-mail: cm4@cm4.es
News
News
2000 units
Quality Control and Testing Case Studies
Car’s hook homologation machine
Railway Sector Case studies
Retractable spoiler for Vitoria’s tram.
Industrialisation and Automatisation Case Studies
Placement station of washers in pipes.
Industrialisation and Automatisation Case Studies
O-rings insertion transfer machine.
News
Frontal protection systems test machine
News
Work station to assembly sets of load cells
News
New facilities
News
Remote controls for train coupling hatches.
News
Testing machine for air extractors with humidity sensor.
  © CM4 Enginyeria,S.A.